Facade

Facade
Florence

Sunday, March 27, 2011

Main Floor Tile Completed

Main Floor Tiles were completed on Friday grout and all. Going the 600x600 porcelain tiles was well worth it.

Front Door Entry 
From the Front Door 

Home Office

from the steps
Kitchen and Dining

Kitchen - they are still yet to finish the plumbing for the sink drains

Wednesday, March 23, 2011

Floor Covering Started - Main Living Tiling.

Passed by the house in the morning and finally the tilers are on site starting on Main Living Floor Covering. In the afternoon they had completed most of the kitchen area.. As discussed it will take 3 days to complete.

Taken from outside the liesure window that was open.


And from the Bedroom hallway which they had not done yet.. only one guess what they left open
Another reason why you should keep checking your house.. keep locking it up for the tradies.


Down the hallway to the front..

Judging from what we can see they only have the bedroom hallway, kitchen, front entry hallway and Home Office. Surface area is alot less than what they covered. thoughi think there is a lot more tile cutting involve tomorrow... I bet that the grouting will be for the 3rd day.

From what i can see so far so good.

Friday, March 18, 2011

CeasarStone benchtops are installed

Ensuite

Main Bath

Bathtub is in also

Kitchen Benchtop and sink is in. We changed our sink from the blanco standard to an AFA cubeline.

These were taken a little late in the afternoon with bad lighting. I'll be taking a thorough photo using my SLR instead of the sony compact camera.

Wednesday, March 16, 2011

Home Stretch. Main Floor Tiles expected this Friday 18th

I have had a chance to get photos of the current status. They have completed Electricals and also the painting. Looks like the plumber has been in to completed the downpipes with the painters painting it.

In the mean time here is an update on my last pics taken. Big post of photos here.

Ensuite Vanity Still waiting on the Ceasarstone benchtop

Ensuite Shower Niche - have a gripe about the edges on this

Ensuite Shower

Slimline Toilet with soft close - woohoo!

Main Bath Vanity same story with CeasarStone Benchtop

Main bath tub

Main Bath Shower Niche

For all our guests the toilet big room

Kitchen where sink dish washer will go

Microwave provision - going to need some fascia quite a big space

Where the freestanding cooktop and oven will go

Overhead cupbaord with bulkheads...not sure how the bulkheads will be down.


Saturday, March 12, 2011

Away last week on holidays... Painting looks to be done and plumbing

We went away up north for a week and quite a few things happened. These shots are from outside since we arrived late on a friday afternoon and no one is on-site.
Front Porch Tiles are done. Tiles are darker than the main living tiles we are having put in.
Kitchen Cupboards in place.. Polyurethane and sharkfin edge (no handles)
Bed 2
Main Bath.. still waiting on the bath tub and ceasar benchtop.
Ensuite toilet. Compact size and whole lot better than what we expected to get.

Waiting to see what happens during the week